Housing Sites: Position Statement 2004 Review
November 2004
Contents/Executive Summary
National guidance
- Government guidance in Planning Policy Guidance Note 3:
Housing (March 2000, DETR) (PPG3):
-
- Priority for re-using previously developed land
within urban areas in preference to greenfield
sites.
- Local authorities should 'manage' the
release of sites over the plan period.
- Local plans should include policies for the
phased release of sites.
- Planning to deliver: the managed release of housing
sites; towards better practice (DLTR, July 2001) (Planning
to Deliver):
-
- Local plans to include policies setting out the
order of release of allocated housing sites.
- Preferred approach is to release sites over
defined periods in a plan. Two alternative
approaches are site releases based on set
criteria or by the ranking of sites.
- Government Circular 08/00 (Residential Development on
Greenfield Land) (DETR, 2000):
- LPA's to first notify the Secretary of State
before granting permission for 150 or more units
on greenfield land (or 5 hectares or more).
Strategic Context
- Hampshire County Structure Plan Review 2001-2011 (Hampshire
County Council, February 2000) (HCSPR):
- Housing requirements set out in two parts -
'baseline provision' and 'reserve
provision'. Local plans to identify sites
for both baseline and reserve provision.
- The third HCSPR Policy H4 Monitoring Paper (HCC
2004) concluded that there is no current need to
release reserve provision.
Local Context
- The Fareham Borough Local Plan Review 2000 (FBLPR):
- Prepared prior to requirement for managed release
of sites and before the HCSPR divided housing
requirements into baseline and reserve provision.
Therefore no order of release policy or allocated
reserve sites.
- The Fareham Urban Housing Capacity Study 2001-2011 (FUHCS):
- Identifies the potential housing capacity of land
within the Borough, identifying extent of
previously developed (pdl) and greenfield land.
- Fareham Housing Strategy 2004-2009 increases affordable
housing target to 100 dwellings per annum.
Overall Housing Supply
- Housing land supply meets HCSPR 'baseline'
housing provision to 2011 (Table 1 Appendix 1), but
not reserve provision.
- Current supply of sites (Appendix 1) is
sufficient for over four year's development,
excluding reserve provision.
Affordable Housing Supply
- Estimated provided for affordable housing
completions over the period 2004-2009 both
through and outside of the planning process.
2004 Release
- Not all allocated and identified housing sites
need to be released.
- Appropriate to identify a sequential approach to
the release of previously-developed, greenfield
or mixed sites.
- Only sites that do not yet have planning
permission by 31 March 2004 are considered
further
Sequential Approach
- First stage of assessment follows sequential
order of: existing urban area (1), urban
extensions (2), and nodal points along major
transport corridors (3).
- Only four sites not considered to be part of the
existing urban area and assessed as urban
extensions: Whiteley Area 11 (Part C); Hunts Pond
Road, Titchfield Common; North of Whiteley (part
without planning permission); Peters Road, Locks
Heath.
Site Comparisons
- Second stage of assessment includes location,
accessibility, capacity of existing and potential
infrastructure and the ability to build
communities.
- Wholly previously developed sites are not
sufficiently different to warrant full assessment.
(Appendix 3)
- The assessment of greenfield or predominantly
greenfield sites (Appendix
4).
- No justification for delaying the release of any
of the sites within the existing urban area (all
categories).
- Whiteley Area 11 (Part C) identified for release
given potential for access improvements to
Whiteley.
- Other 3 identified urban extensions not needed
for release at the present time.
Future Release of Sites
- Release of housing sites to be reviewed annually.
- The release of the reserve provision may lead to
early reconsideration of this Position Statement.
Appendices
| Appendix
1 |
Housing Land Supply Position |
| Appendix 2 |
Release of Housing Sites |
| |
Table 2 -
Allocated/Identified large previously developed
housing sites for release |
| |
Table 3 -
Allocated/Identified large housing sites which
are mixed previously developed/greenfield or 100%
greenfield for release |
| |
Table 4 -
Predominantly Greenfield Allocated/Identified
Sites - Assessments and Site Plans |
| Appendix
3 |
Previously Developed Sites Allocated in the
Local Plan or Identified in the Urban Housing
Capacity Study - Site Plans |
| Appendix 4 |
Predominantly Greenfield Allocated/Identified
Sites - Assessments and Site Plans |
| Appendix 5 |
FBLPR Housing Extracts |
| Appendix 6 |
Actual and Projected Housing Completions |
| Appendix 7 |
Allocated Greenfield Sites not released |
| Appendix 8 |
Projected Affordable Housing Completions |
Back to Planning &